Friday, May 31, 2019

Now That We Have An RV . . .

I had to make a wall hanging for our new-to-us RV.  I actually started it a couple years ago, but last fall I went through my unfinished projects and started getting some of them completed.  This is one of them.  I have about 30 more. Remember, slow and steady wins the race.
When we took our trip to SD, we left Ebby at home with a pet sitter.  We want to be able to take her with us on future trips, so we kidnapped her from the house and put her in the RV.  We did not start it up or go anywhere, we just spend most of the day out there with her, so she could get used to her surroundings.  She did do some exploring but then she wanted to stay on the floor instead of looking out a window, so put her on the bed under the quilt.  She likes hiding under quilts.
So, what did I do while hanging out with Ebby in the RV?  I did some piecing!  Our quilting group has a Block of the Month challenge and I pieced my BOM and an extra one, in bright fabrics, for the quilt for my Aunt Karen.  I don't believe the photo below demonstrates just how blinding bright the yellow fabric is.  It looks pretty mellow here, but it is not.
I set up the sewing machine on the table and sewed these together.  Then I cut out some fish! If you can tell me what kind of fish these are, I will send you a custom made zipper bag (made by me).  You can e-mail me at csz@cableone.net with your answer.  I will keep this offer open until July 4.
I welcome your comments, but for some reason my blog/Google will not let me reply to your comments.

Friday, May 24, 2019

Five Projects Going At Once!

I have been so busy.  I work 40 hours a week. My husband and I just took a week and went to South Dakota in our new-to-us RV.  We had a fun, relaxing, yet adventurous week on the road from ID to SD and back.  We went to see Mt Rushmore, and decided to see some other things along the way.  I will be getting a post on my travel blog in a day or so.  I have the first day all typed up . . . I did that when we had our blow out about ten miles east of Dubois, WY, but I have not had a minute to get more typed up.  I took a lot of photos and only had a chance to look at them last night.  It has done nothing but rain here, since we got back from SD.  
A peony in my front yard. It is one I transplanted from our previous house
Last weekend, I got the binding sewed onto Dianna's quilt. On Monday evening I finished quilting Dani Jo's two-year old quilt and started the binding. Tuesday I finished the binding on both Dani Joe's big girl quilt and her doll quilt.  I need to get those triangles cut out to finish the stack n whack that is on my design wall, and get the binding on Teresa's b&w mostly quilt, then I promised A that I would put the binding on her quilt.  I got three quilts all finished up in one week! Crazy!

Dani Jo is turning two, so I made her this big girl quilt.  I used my stash of cupcake fabrics to make it and the matching doll quilt.  I quilted them both on my home machines.  I do the stitch in the ditch on my Husqvarna, and the free-motion on my Necchi.  I made some fun loop-d-loos in the purple polka dot borders.
.
This is the doll quilt.  It is 22 X 22 inches.  It has the same purple polka dot fabric as the big one, but I used it as the backing.  Below, is a photo of the back of the big girl quilt:
I will post a couple photos of Dianna's fabulous quilt after I get some bodies to hold it up while I photograph it.  It is B-I-G.